PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed conduit at the steel columns (2nd Floor) Facing West (800x600).jpg Installed conduit Facing South (800x600).jpg Installed rebar at the pour stops around the 2nd floor Facing East (800x600).jpg Laying out the beam clips at Rahway Ave. (2nd Floor) Facing North (800x600).jpg UCFC Site Facing North-West (800x600).jpg
Previous page UCFC Site Facing North-West (800x600)
UCFC Site Facing North-West (800x600)